Answer:
2150 minutes
Explanation:
The unit rate = 7/10 cranes per minute
So the number of minutes it would take Jason to make 1505 cranes is:
10/7 x 1505 = 2150 minutes.
Another way:
1505 cranes / 7 cranes = 215
215 x 10 minutes = 2150
So, the number of minutes would it would take Kenny to fold 1505 cranes is
10/7 x 1505 = 2150 minutes
2150/60 = 35 5/6 hours
1.6m questions
2.0m answers