If it takes 6 hours for Matt to wash the car, then he washes at a rate of 1/6 cars per hour:
Let y be the time in which Matt's dad washes the car and state an equation that describes the situation in which Matt and his dad wash the car together:
It means that he washes the car in 6/11 hours (approximately 0.54hours).