Answer:
John spent 2.7 hours working on the project.
Explanation:
Dawn: 5x-1.5 with x representing the number of hours John spent
Keith: 4x+1.2
If Dawn and Keith spent equal time then these 2 equations equal each other then solve for x.
5x-1.5=4x+1.2
5x-4x=1.2+1.5
x=2.7