482,950 views
9 votes
9 votes
Which of the following is the central issue underlying a problem that needs to be addressed? A. Sprint

B. Success criteria. C. Rapid prototyping
D. Root cause

User Yusubov
by
3.1k points

1 Answer

16 votes
16 votes
C because that’s the way the history teacher taught me
User Adrian Adendrata
by
3.1k points