Answer:
0.77
Explanation:
From the information given:
The breakdown time (a)= 3 hours
The breakdown rate (λ) = 1/a = 1/3
Average flow time in the system (W) = 2.305 hours
For the entire system;
The average down machines L = Wλ
= 2.305 × (1/3)
= 0.77