Answer:
37.28
Step-by-step explanation:
Calculation to determine the company's plantwide overhead rate
Plantwide overhead rate = (3,700,000+960000)/125000
Plantwide overhead rate =4,660,000/125,000
Plantwide overhead rate = 37.28
Therefore the company's plantwide overhead rate is 37.28