Answer:
Option b is correct.
Step-by-step explanation:
Option b is correct.
The sunk cost is the cost that has been incurred and which can not be recovered. Thus, anycost that can not be recovered is called the sunk cost. Therefore, the option 'b' that states pushing wrong button and getting a wheatgrass sandwich is the sunk cost because it can not be returned.