Answer:
To find the total cost of producing 210 drills, we need to calculate the costs for materials, labor, and manufacturing space rent.
1. Cost of materials per drill: $89
- Multiply the cost of materials per drill by the number of drills: $89 * 210 = $18,690
2. Cost of labor per drill: $35
- Multiply the cost of labor per drill by the number of drills: $35 * 210 = $7,350
3. Cost of manufacturing space rent per month: $4,000
- Since the problem does not specify the time period, we assume it's for one month.
Now, we can calculate the total cost by adding the costs of materials, labor, and manufacturing space rent:
Total cost = Cost of materials + Cost of labor + Cost of manufacturing space rent
= $18,690 + $7,350 + $4,000
= $30,040
Therefore, the total cost for Tools Plus Company to make 210 drills is $30,040.