431,364 views
11 votes
11 votes
an industrial plant load is rated at 2.8 mva at 0.7 pf lagging. if a capacitor bank rated at 3 mva is added to the load, the new overall power factor of the system is most nearly:

User Grandrew
by
2.7k points

1 Answer

15 votes
15 votes

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

User AllisonC
by
3.0k points