Final answer:
To create a time chart for "vendor_sales", plot the time on the horizontal axis and the vendor sales values on the vertical axis. Use appropriate scales for both axes, plot each data point, and connect them with lines to represent the sales trend over time.
Step-by-step explanation:
To plot a time chart for a field named vendor_sales, you would use a time series graph. Start by setting up a standard Cartesian coordinate system with a horizontal axis for time (e.g., minutes, hours, days) and a vertical axis for the vendor_sales values. Mark the axes appropriately, ensuring each is numbered correctly according to the data's scale.
For instance, if time is recorded in 10-minute increments, the x-axis should have tick marks every 10 minutes. Similarly, if the vendor_sales figures range from 0 to a maximum value, choose a scale for the y-axis that comfortably includes this range with evenly spaced tick marks.
Next, plot the data points on the graph. Each point represents a vendor sale measurement at a specific time. Start at the appropriate time on the x-axis, find the corresponding vendor_sales value on the y-axis, and place a dot at this intersection. Connect these dots with straight lines to show the trend over time. This practice helps visualize how vendor_sales have changed during the given timeframe.