Final answer:
The copy machine produces 113 jobs per day, with each job taking a total of 4 minutes.
Step-by-step explanation:
To answer the student's question, on a typical day, the copy machine produces 113 jobs. The total time taken for each job on the machine is the sum of processing time and setup time. Since each job takes 2 minutes for processing and 2 minutes for setup, the total time taken for each job is 4 minutes.