You are the Sort AM and have noticed the number of MNR items has significantly increased day over day from 250 to 965. When deep diving the packages you notice 70% of the MNR items have been in the system for over 6 days indicating the package scrub has been missed multiple times. How does this impact cost?

1 Answer

3 votes

Final answer:

The missed package scrub process of MNR items can lead to inefficiencies and delays, resulting in increased storage costs and reduced sorting efficiency.

Step-by-step explanation:

The significant increase in the number of MNR items from 250 to 965 indicates a problem with the package scrub process. The fact that 70% of the MNR items have been in the system for over 6 days suggests that the package scrub has been missed multiple times. This has an impact on cost because it leads to inefficiencies and delays in sorting and processing the items.

When the package scrub is missed, MNR items remain in the system for longer periods, which increases storage costs and reduces the overall efficiency of the sorting process. Additionally, if these items are time-sensitive or perishable, the delayed sorting process can result in spoilage and additional losses.

To address this issue, it is important for the Sort AM to ensure that the package scrub is conducted regularly and consistently. By identifying and removing MNR items in a timely manner, the cost and operational impact can be minimized, resulting in a more efficient and cost-effective sorting process.