If you have a project with more than one building or area, should you enable the "Drawings by Area" feature?

1 Answer

3 votes

Final answer:

Enabling the 'Drawings by Area' feature is advisable for projects with multiple buildings or areas as it improves organization, communication, and efficiency by providing specific sets of drawings for each area, facilitating the management process for those involved in construction and design.

Step-by-step explanation:

If you are managing a project with more than one building or area, enabling the "Drawings by Area" feature could be beneficial. This feature will allow you to organize and manage your drawings more efficiently. Particularly in larger projects, this can help in keeping track of changes, revisions, and updates specific to each area. It can also facilitate better communication with the team members who are responsible for different sections of the project.

For instance, if you are working on a construction project that includes separate buildings, you can assign each building its set of drawings. This way, the relevant stakeholders can access only the information that is pertinent to their work, decreasing the chance for confusion and ensuring that everyone is on the same page. Subcontractors, inspectors, and project managers will find it easier to locate the drawings they need, saving time and reducing errors that can occur when sifting through a large and complicated set of plans.

Ultimately, the decision to enable "Drawings by Area" should be based on the complexity and scope of the project. If each area within the project requires distinct specifications, using this feature would likely improve project workflow and efficiency.