Final answer:
To draw the timeline diagram showing the RTO and MTD for each scenario in a combined business process, you need to analyze the given information, list the components, assign RTO and MTD to each component, and draw a timeline diagram. Example RTO and MTD values can be assigned to each component and represented in the timeline diagram.
Step-by-step explanation:
To draw the timeline diagram showing the RTO (Recovery Time Objective) and MTD (Maximum Tolerable Downtime) for each scenario, you need to follow these steps:
- Analyze the problem and identify the given information.
- List the components of the combined business process.
- Assign a Recovery Time Objective (RTO) and a Maximum Tolerable Downtime (MTD) to each component.
- Draw a timeline diagram showing the components and their associated RTO and MTD.
For example, let's say the components are A, B, and C with the following RTOs and MTDs: Component A - RTO: 2 hours, MTD: 4 hours; Component B - RTO: 1 hour, MTD: 3 hours; Component C - RTO: 3 hours, MTD: 5 hours. You would draw a timeline with Component A, Component B, and Component C, along with the respective RTO and MTD.