Which of the following is a direct input into capacity requirements planning?

(I) the master production schedule
(II) routing information
(III) current shop loads
(IV) planned-order releases

User Shenxian
by
8.3k points

1 Answer

3 votes

Final answer:

The direct inputs into capacity requirements planning include the master production schedule, routing information, current shop loads, and planned-order releases.

Step-by-step explanation:

The direct inputs into capacity requirements planning include the following:

  1. The master production schedule (MPS): This provides information about what products are to be produced, in what quantities, and when they are needed. It serves as the starting point for capacity planning.
  2. Routing information: This includes details about the sequence of operations required to produce a product, including the machines, equipment, and tools needed for each step. It helps determine the capacity requirements.
  3. Current shop loads: This refers to the existing workload and usage of resources in the shop. It provides insight into the available capacity and helps identify any bottlenecks or underutilized resources.
  4. Planned-order releases: These are the planned orders for materials or components needed to fulfill the production schedule. They impact the capacity requirements by specifying the timing and quantities of materials required.