Final answer:
The total manufacturing cost is $696,000.
Step-by-step explanation:
The total manufacturing cost can be calculated by adding the prime costs and conversion costs together. Prime costs are the direct costs of materials used in the production process and the direct labor costs involved. Conversion costs include direct labor costs and indirect costs such as factory overhead. To calculate the total manufacturing cost:
- Prime Cost = Direct Materials Used + Direct Labor = $85,000 + $195,000 = $280,000
- Conversion Cost = Direct Labor + Factory Overhead = $195,000 + $221,000 = $416,000
- Total Manufacturing Cost = Prime Cost + Conversion Cost = $280,000 + $416,000 = $696,000
So, the total manufacturing cost is $696,000.