200k views
4 votes
Case Study-

You need to configure the options for the schedule. Which options should you configure for the following?
1) Resource Type
2) Vice President's Schedule

1 Answer

1 vote

Final answer:

The schedule options should include considerations for types of resources, their availability, and the Vice President's commitments and time management. The Schedule of Work provides guidelines for dates of availability and due dates, key for efficient scheduling.

Step-by-step explanation:

Configuring the Schedule Options

When considering the configuration of schedule options for a Resource Type and the Vice President's Schedule, several key aspects should be addressed. Firstly, for the Resource Type, one must determine the kind of resources required, their availability, and how they should be allocated. The most suitable schedule is often dictated by the nature of resources—their qualifications, working hours, and related constraints.

For the Vice President's Schedule, it's critical to factor in the executive's commitments, meetings, and travel time. A strategic approach to time management should be fostered, ensuring that priority tasks are allocated appropriate slots in the schedule, and sufficient buffer time is included to account for unforeseen events or overruns.

It's advisable to use the Schedule of Work for determining dates of availability and due dates. These dates can serve as guidelines when arranging the schedules. For both the Resource Type and Vice President's Schedule, consideration of personnel or executive availability during these periods is crucial in an efficient and functional scheduling process.

User Leostiw
by
7.7k points