1 . Since 10 meters of leathere cost 13.30
a meter of leather cost 13.30/10 = 1.33 $
2 . 1 meter is 3.28 foot
3. Therefore 1 foot would cost 1.33*3.28 = 4.36$
1.6m questions
2.0m answers