What types of process assets are correct about requirements engineering process assets?

A. Checklist, Example, Plan, Policy, Procedure, Process description, Template
B. Checklist, Example, Plan, Policy, Procedure, Process description, Template, Cost Evaluating

1 Answer

4 votes

Final answer:

The correct types of process assets about requirements engineering process assets are Checklist, Example, Plan, Policy, Procedure, Process description, and Template. Hence, A) is correct.

Step-by-step explanation:

The correct types of process assets about requirements engineering process assets are:

  1. Checklist: A list of items or tasks to be completed during the requirements engineering process.
  2. Example: A sample or instance that demonstrates a specific requirement or design.
  3. Plan: A detailed outline or strategy for carrying out the requirements engineering process.
  4. Policy: A set of guidelines or principles to govern the requirements engineering process.
  5. Procedure: A step-by-step method or series of actions to be followed during the requirements engineering process.
  6. Process description: A detailed explanation or documentation of the requirements engineering process.
  7. Template: A pre-designed format or framework for capturing and organizing requirements.

These process assets provide structure and guidance to ensure that requirements are effectively captured, analyzed, and managed throughout the engineering design process.