Final answer:
The manufacturing overhead cost for Job #101 is calculated by subtracting the sum of Direct Materials and Direct Labor from the Total Cost. The result is $800, making option 3 the correct answer.
Step-by-step explanation:
The student's question relates to calculating the manufacturing overhead cost for Job #101 based on the costs provided. To find the manufacturing overhead, we need to subtract the sum of Direct Materials and Direct Labor costs from the Total Cost. We are given:
- Total Cost: $2,400
- Direct Materials: $900
- Direct Labor: $700
The manufacturing overhead can be calculated as follows:
$2,400 Total Cost - ($900 Direct Materials + $700 Direct Labor) = $800 Manufacturing Overhead
Therefore, the manufacturing overhead cost for Job #101 is $800, which corresponds to option 3 in the question.