Answer:
Step-by-step explanation:
The prime costs are the sum of direct materials cost and direct labor cost.
So, prime costs = Direct materials + Direct labor
prime costs = $48,200 + $24,400
prime costs = $72,600
Therefore, the prime costs during the month totaled $72,600.
The correct answer is (a) $72,600.