2. If 9 men can do a piece of work in 6 days, how long will it take 12 men to do the same work?​

User Osolmaz
by
6.8k points

1 Answer

5 votes

Answer: 4.5 Days

Explanation:

The work requires 9 men x 6 days or 54 man-days.

So 12 men will do the same work in 54 man-days/12 men

= 4.5 days.