A car can be assembled on an assembly line in 6 hours. Assume that the cars are assembled at a constant rate.

. a. How many cars, y, can be assembled in t hours?
b. How many cars can be assembled in a week?

1 Answer

2 votes

Answer:

a.
y = (t)/(6)

b. y = 28

Explanation:


y = (t)/(6)

1 day = 24 hours

1 week = 7 days

In 24 hours:


y = (24)/(6)

y = 4

4 cars/day

In 1 week


y =(7)((24)/(6))=7*4

y = 28