Answer: 8 minutes
Explanation:
Given equation: 24x + 64y = 384, that represents the canned goods order .
where x = number of minutes spent producing fruit cans,
and y = number of minutes producing vegetable cans.
If the vegetable assembly line runs for 3 minutes, then put y=3 in equation we get

Therefore, the fruit assembly line need to run to complete the order of 384 cans in 18 minutes.