A stretch budget is a budget that? ________.

a. represents a? challenging, but achievable level of performance

b. is impossible to implement in a cost center

c. crosses more than one responsibility center

d. is designed to include the effects of exchange rate fluctuations

User DJElbow
by
8.3k points

1 Answer

1 vote
The answer is letter C.