397,159 views
36 votes
36 votes
Refer to the picture:I just need help with answering letter D.

Refer to the picture:I just need help with answering letter D.-example-1
User Terite
by
3.1k points

1 Answer

11 votes
11 votes

The z-score of the score, 58, for the number of calls can be calculated using the formula:


z=(x-\mu)/(\sigma)

where μ is the mean and σ is the standard deviation.

From the question, we have the following parameters:


\begin{gathered} \mu=34 \\ \sigma=12 \end{gathered}

Therefore, the z-score is calculated to be:


\begin{gathered} z=(58-34)/(12) \\ z=(24)/(12) \\ z=2 \end{gathered}

Using a probability calculator, the probability for the z-score is given to be:


P(z>2)=0.02275

Given the probability value, we can calculate the expected value of this event for the survey size of 100 to be:


EV=0.02275*100=2.275

Therefore, approximately 2 installers made more than 58 service calls.

User Resle
by
3.5k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.