Which option distinguishes the concept of project development being most directly impacted in the following scenario? The new water park in a small city in northern Michigan ran into a sewage backup problem, and the opening was delayed by a month. cost safety quality scheduling

User Sanaa
by
5.2k points

2 Answers

4 votes
Hi there!

The answer would be safety since the people that would go there and the local inhabitants would need a safe environment to have this project accepted and follow through.

-Your friend, ASIAX
User Popopome
by
5.7k points
5 votes
safety

Sewers are made to bring waste and other trash to somewhere more safe to dispose of, and if the sewage backup had a problem, that would mean that it would be a safety hazard to the inhabitants in the area

hope this helps
User AnteAdamovic