Answer:

C(x) = 75x + 1908

Explanation:

C(x) is the cost function.

The cost of making x bicycles is the sum of the fixed costs and the cost per bicycle.

The fixed cost is $1908.

The cost per bicycle is $75, so the per bicycle cost for x bicycles is 75x.

Add the two costs, and you get:

C(x) = 75x + 1908