130k views
4 votes
determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100-n and block from 2 m-example-1
User Btford
by
5.9k points

2 Answers

4 votes

Answer:400j!

Step-by-step explanation:

User Sonja
by
5.9k points
3 votes

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d


W = 100\ N* 4\ m


W = 400 J

Hence, the quantity of work done is 400 J

User Sergio Bost
by
6.1k points