35.3k views
3 votes
The raw material that is added to a system for processing is known as _______. A. positive feedback B. negative feedback C. the input D. the output

User Zanhtet
by
5.3k points

2 Answers

2 votes
C i hope this helps ;3
User Ytropek
by
5.5k points
4 votes
The answer to this is Input
User John A Qualls
by
5.9k points