214k views
4 votes
A forklift raises a 1,020 N crate 3.50 m up to a shelf. How much work is done by the forklift on the crate

User Sgerbhctim
by
7.0k points

2 Answers

6 votes

Answer: 3750

Explanation:

just multiply

User Hsan
by
7.5k points
2 votes
W = F×D
W= 1020 ×3.5
W= 3570
User Djc
by
6.8k points