Answer:
First, make a dot on the coordinate (0,3). (Which would be a 3 on the vertical axis).
Then, move from that dot up 3 units, and right 4 units.
Make another dot there.
Continue moving up 3 and right 4.
Connect the dots and make the line across the graph.
Hope this helps.