Answer:
- 80t = 50(t+2)
- master: 3 1/3 hours
- assistant: 5 1/3 hours
Explanation:
Given an assistant bricklayer laying 50 bricks an hour has worked 2 hours longer than a master bricklayer laying 80 bricks an hour, you want an equation stating they have laid the same number of bricks. You also want to know how long each has worked.
Rate and output
The output of each bricklayer is the product of the rate at which they lay bricks and the time for which they do it. If t is the time spent by the master bricklayer, their output will be 80t. The time spent by the assistant will be (t+2) hours, and their output will be 50(t+2).
Here is the equation that says their output is the same:
80t = 50(t+2)
Time
Solving the equation for t, we have ...
80t = 50t +100
30t = 100 . . . . . . . . . subtract 50t
t = 3 1/3 . . . . . . . divide by 30
The master bricklayer has worked 3 1/3 hours when they have laid the same number of bricks.
The assistant bricklayer has worked 5 1/3 hours at that time.
__
Additional comment
Each will have laid (80)(3 1/3) = 266 2/3 bricks.