263,913 views
6 votes
6 votes
A carpenter needs 7.8 feet of rope for a project. How much will the carpenter spend if the rope costs $3.98 per foot? PLEASE SHOW WORK

User Dave Rottino
by
2.9k points

1 Answer

26 votes
26 votes

7.8×3.98= 31.04 is the correct answer

User Fabilous
by
2.8k points