I’m not sure on this one but what I think you need to graph is the different floors on the Y axis and the time on the X axis. For the time, label it as 1 minute, 1m 30 secs, 2 mins, 2 mins 30 secs and so on. Then you can plot the points. Don’t take my word for this one because I’m not too familiar with these. Sorry I couldn’t be as helpful ~~