Compute the takt time for a service system that intended to perform a standardized service. The system will have a total work time of 352 minutes per day, excluding three 16-minute breaks, and an hour for lunch. The service system must process 82 jobs a day

User Lernerbot
by
3.7k points

1 Answer

9 votes

Answer:

2.98 minutes per cycle

Step-by-step explanation:

Total work time = 352 minutes per day

Break time = 16 min*3 = 48 min

Lunch time = 60 min

Total time left = 352 - 48 - 60 = 244 min

Demand = 82 jobs a day

Takt time = Total production time available/Demand

Takt time = 244/82

Takt time = 2.9756

Takt time = 2.98 minutes per cycle