Answer:
Step-by-step explanation:
The journal entry is shown below:
Work in Process A/c - Assembly department A/c Dr $52,320
Work in Process A/c - Finishing department A/c Dr $41,440
To Manufacturing overhead A/c $93,760
(Being the overhead are allocated to the Assembly and Finishing Departments)
The allocation of the assembly department equals to
= Raw material × percentage of labor cost
= $32,700 × 160%
= $52,320
The allocation of the finishing department equals to
= (Factory labor cost - factory labor) × percentage of labor cost
= ($63,800 - $37,900) × 160%
= $25,900 × 160%
= $41,440