Answer:
72 minutes
Step-by-step explanation:
The combined rate of the two machines is 250 bolts/hr:
(100 bolts/hr) + (150 bolts/hr) = 250 bolts/hr
The number of bolts is equal to the rate multiplied by time, therefore an expression for time can be found:
Bolts = (rate)(time) >> Time = (bolts)/(rate)
The time necessary to make 300 bolts is:
Time = (bolts)/(rate)
Times = (300 bolts) / (250 bolts/hr) = 1.2 hr
The time in hours is converted to time in minutes as follows:
(1.2 hr) (60 min/hr) = 72 minutes