Answer:
1. 7.5 hours
2. 5.96 minutes
Explanation:
1. In 2 hours, the first crew will have completed 2/8 = 1/4 of the work. The second crew will need 3/4×10 hours = 7.5 hours to complete the work.
__
2. The two students are separating at the rate of (300 + 200) ft/min = 500 ft/min. They will add 2980 ft to their initial 20 ft separation in ...
2980 ft/(500 ft/min) = 5.96 min