22 votes
A building contractor is to dig a foundation 30 feet​ long, 12 feet​ wide, and 6 feet deep. The contractor pays ​$20 per load for trucks to remove the dirt. Each truck holds 8 cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

User Oscar Gomez
by
2.7k points

1 Answer

22 votes
22 votes

Answer:

$1800

Explanation:

Volume of the foundation: 30*12*6 = 2160 cubic feet

we need to convert this into yards because a truckload is 8 cubic yards, 2160/3 = 720 cubic yd

One truckload is 8 cubic yards

# of truckloads needed: 720/8 = 90 truckloads

Cost: $20*90 = $1800