Help please?

Sorry for the bad pic.

This is Algebra ll.

Im stuck here.

please show me step by step

Help please? Sorry for the bad pic. This is Algebra ll. Im stuck here. please show-example-1
User Pfernandom
by
5.5k points

1 Answer

4 votes

Answer: It would take 9 hours for 4 painters to paint 720 feet of fence.

Explanation:

1.) Calculate the time needed to paint the 720 ft fence with 2 painters.

a.) Divide 720 by 280 to get how many times greater 720 is than 280.

720 / 280 ≈ 2.57

b.) Multiply the time needed to paint the 280 ft fence with 2 painters by 2.57.

7 * 2.57 ≈ 18

2.) Calculate the time needed to paint the 720 ft fence with 4 painters.

a.) Assuming that each painter paints the same amount of fence, divide the time in half, as 4 painters is double the original amount, so it would take half of the time.

18 / 2 = 9