135k views
3 votes
When costs can be traced to a particular cost object in an economically feasible way, the cost is a:

a.direct cost

b.indirect cost

c.allocated cost

d.budgeted cost?

1 Answer

4 votes

Direct costs.

Some costs are more difficult to assign to particular product, but direct costs can be completely attributed to a particular product or service.

User Nachman
by
5.4k points