478,493 views
5 votes
5 votes
3 men build a wall in 2 days.

How long will it take
a) 1 man
b) 2 men?

Please show working

User Miguelarc
by
2.7k points

2 Answers

15 votes
15 votes
The number of man-days required for the wall is 3 x 2 = 6
Assuming each man consistently produces the same amount of effort
then 1 man will take 6/1 = 6 days
and 2 men will take 6/2 = 3 days
User Homer Jay Simpson
by
3.2k points
30 votes
30 votes

Answer:

Explanation:

Big clever stuff 100 men in 1 second tick tick boom

User Vishwarajanand
by
3.5k points