a construction worker needs to pour a rectangular slab 23 ft long, 24 ft wide, and 8 in thick. how many cubic yards does the construction worker need?​

User Antonella
by
4.7k points

1 Answer

3 votes

Explanation:

Volume = lwh

V = 23 x 24 x 8

V = 4416ft^3

Ft - Yd:

4416ft^3 = 163.5556^3 yd

(I'm not actually sure about this as I don't use the imperial system)